Foundation of Lincoln Home, near junction of south east pillar and south porch, during the 187-88 restoration. Photographer facing north. Basement/crawl space vent can be seen on the left side of the photo.
View of the demolition work on the north basement steps, and repairs to the basement and foundation wall during the 1987-88 restoration. Photographer facing south west.
View of the demolition work on the north basement steps, and repairs to the basement and foundation wall during the 1987-88 restoration. Photographer facing south.
The wall foundation, yard, and retaining wall along the south side of the Lincoln Home during the 1987-88 restoration. At this point in the construction, the south porch had been removed (seen on the far right of the photo), as well as the fencing along the south and west sides of the lot. Photographer facing…
A section of brick near the south west corner of the Lincoln Home. A sewer drain sits to the upper right of the photograph, with concrete drain to the left. Photographer facing north east. See photo 61847 for reference.