Lincoln Home Reopening B6F41P69

Two rangers speak to a group of donors during the reopening of the Lincoln Home in 1988. A third ranger stands in the background. Photographer facing south west.

Lincoln Home Restoration 1987-88 B4F6P533

Two construction crew members working on the reconstruction of the west retaining wall of the Lincoln Home. NPS staff member Vee Pollack stands between them, looking at the camera. The pre-relocation Corneau House stands in the background, far left. Photographer facing north east.

Lincoln Home Restoration B4F30P197

Ranger and visitor viewing the front hall wallpaper of the Lincoln Home prior to removal. The plaster on the underside of the stairwell has already been removed, revealing the lathwork and the underside of the stairs. Photographer facing east.

Lincoln Home Restoration B4F28P84

Photo of two staff members carrying an artifact up the front (west) stairwell during the Lincoln Home restoration. Construction is complete on the stairwell, but the carpet runner has not been installed on the stairs, and the handrail is still wrapped for protection. Wallpaper replacement has also been completed for the stairwell. Photographer facing east.

Lincoln Home Restoration B4F30P50

A worker exposes lath work and framing under west/entrance stairwell during the 1987-1988 Lincoln Home Restoration. Two NPS employees watch in the background. Photographer facing east.

Featured Collections