Lincoln Home Restoration 1987-88 B4F1P48

The west face of the Lincoln Home during the 1987-88 Restoration. A recessed concrete form can be seen in place west of the Lincoln Home, ready for pouring. The concrete will form a foundation for the concrete/stone steps leading up to the Lincoln Home, hidden by soil, sand, and the bricks that make up the…

Lincoln Home Restoration B7F7P7

Rubble outside the Lincoln Home during the 1987-1988 Restoration. Wooden curbing and steel street drain grate can be seen on left side of photo. Probably a view of the torn-up brick plaza. Exact location unknown.

Lincoln Home Restoration B7F7P2

Stonework or concrete found while digging during the 1987-1988 Lincoln Home Restoration. Exact location unknown, but probably along foundation.

Featured Collections