Two construction workers rebuild the retaining wall on the south west corner of the Lincoln Home lot. The well/sewer drain can be seen in the middle-right of the image.note the use of brick and cinder block. Photographer facing north west.

Two construction workers rebuild the retaining wall on the south west corner of the Lincoln Home lot. The well/sewer drain can be seen in the middle-right of the image.note the use of brick and cinder block. Photographer facing north west.
Location:
Lincoln Home - West Foundation Wall, Outside
Date:
September 1987
Original Media:
b/w print
Original Scanned Image Size:
4.88 x 3.45 inches
Image ID:
61437
Topics:

More Photos from Lincoln Home - West Foundation Wall

Lincoln Home Restoration B4F8P12

Recessed concrete form in place west of the Lincoln Home, ready for pouring. The concrete will form a foundation for the concrete/stone steps leading up to the Lincoln Home, hidden by soil, sand, and the bricks that make up the plaza. The west retaining wall sits behind the form, with an opening for the second…

The excavated front (west) yard of the Lincoln Home. The west retaining wall can be seen to the right of the image, with a support footing for the front steps of the Lincoln Home in the foreground, left. Note the plastic water protection for the foundation. The Cook house can be seen in the background, along with a single ranger.

The excavated front (west) yard of the Lincoln Home. The west retaining wall can be seen to the right of the image, with a support footing for the front steps of the Lincoln Home in the foreground, left. Note the plastic water protection for the foundation. The Cook house can be seen in the background,…

Not what you were looking for?