South retaining wall, and plywood form for concrete stair support, near south porch of Lincoln Home and lot. Photographer facing west.
Keyword: South Wall
Existing conditions before major removals begin in Stuve House, basement. Room B3, south wall, detail.
Existing conditions before major removals begin in Stuve House basement. Room B3, south wall, detail.
Existing conditions before major removals begin in Stuve House basement. Room B3, south wall.
Existing conditions before major removals begin in Stuve House. Basement, Room B4-5-6, south wall.
A view of red, white, and blue bunting hanging on the south retaining wall of the Lincoln Home prior to the reopening ceremony for the Lincoln Home. Photographer facing west.
A view of the semi-demolished south retaining wall of the Lincoln Home during the 1987-88 Restoration. Photographer facing east.
East Side 15-Nov Lincoln Home, Restoration, South Wall
Wall On South Side 16-Nov Lincoln Home, Restoration, South Wall