Work on the south facing, porch, and yard of the Lincoln Home, during the 1987-88 restoration. Photographer facing north west.
Keyword: Scaffolding
A construction crew member working on the north west corner of the Lincoln Home. The Corneau house can be seen in the center background. Photographer facing north east.
Two construction crew members working on the reconstruction of the west retaining wall of the Lincoln Home. NPS staff member Vee Pollack stands in middle foreground. The pre-relocation Corneau House stands in the background, far left. Photographer facing north east.
Two construction crew members working on the reconstruction of the west retaining wall of the Lincoln Home. NPS staff member Vee Pollack stands between them, looking at the camera. The pre-relocation Corneau House stands in the background, far left. Photographer facing north east.
A worker installs the wood cap on the Lincoln Home retaining wall. Lyon House in the background, left. Photographer facing north west.
Scaffolding, tarps, and bare soil on the west side of the Lincoln Home during the 1987-88 Restoration. Photographer facing North.
Worker, foundation, and scaffolding along the north side of the Lincoln Home during the 1987-1988 Restoration. Photographer facing south west.
Repairs to the the north foundation wall, boards, and siding of the Lincoln Home. Scaffolding visible in foreground. Photographer facing south west.
Detail of scaffolding support attached to Tyvek cover and internal structure of Lincoln Home exterior wall during the 1987-1988 Restoration. 2nd floor windows, siding, and cornices can be seen.
Detail of scaffolding support attached to Tyvek cover and internal structure of Lincoln Home exterior wall during the 1987-1988 Restoration. Siding, and cornices can be seen.
