NA Lincoln Home NHS- Visitor Center remodel, Roll 2000-9, exp 25 Visitor Center, remodel, theater
Keyword: Remodel
Theater 2 Lincoln Home NHS- Visitor Center remodel, Roll 2000-8, exp 21 Visitor Center, remodel, theatre
Theater 2 Lincoln Home NHS- Visitor Center remodel, Roll 2000-8, exp 20 Visitor Center, remodel, theatre
Visitor Center -remodeling, partially installed sinks in Men's restroom. Historian Tim Townsend reflected in mirror. Looking West from urinal area Visitor Center, remodel, restroom, sinks, staff
Visitor Center - remodeling, handicapped stall partially installed. Toilet seat remains in cardboard box on top of toilet. Handrails installed on tile wall. Lincoln Home NHS- Visitor Center remodel, Roll 2000-2, exp 19 Visitor Center, remodel, restroom, handicapped stall
Visitor Center - remodeling, toilet with stall walls partially installed. Toilet seats remain in cardboard box on top of toilet. Sink visible on far right. Looking East from urinal area in Men's restroom Visitor Center, remodel, restroom, toilets
Visitor Center - remodeling, urinals partially installed Looking Northwest from Men's restroom doorway Visitor Center, remodel, restroom, urinals
Visitor Center - remodeling, urinals partially installed in Men's restroom Looking West from sink area in restroom Visitor Center, remodel, restroom, urinals
Visitor Center remodeling - Sink/towel area in women's restroom completed. Looking North from toilet area Visitor Center, remodel, restroom, sinks
Visitor Center - remodeling, sinks/countertop closeup (photo blurry). Automatic start faucets over white sinks incorporated into the countertop. Other equipment in boxes on far right. Tile wall visible. Looking South from Women's Restroom Visitor Center, remodel, restroom, sinks, tile