Morse - restoration, modern porch sill removed. Originally located on the Southeast corner of the house associated with an enclosed porch. Un-restored Morse House in background left. Maintenance worker Eric Turner? working on remains of porch. City parking garage in background center. Looking Northwest from Morse Lot (Block 10, Lots 15-16) Morse, Restoration, parking garage,…
Keyword: Parking Garage
Iles School Living History program - Students perform mock trial on porch of Conference Center while school group watches from boardwalk. City parking garage in background left. Looking Northeast from 8th Street Iles School, living history, mock trial, Conference Center, parking garage, students, school groups
Iles School Living History program - students in 8th Street playing 19th century games. School group watches mock trial on Conference Center porch in background right. City parking garage in background center. Looking North/Northeast from boardwalk West of 8th Street Iles School, living history, games, students, school groups, Conference Center, parking garage, 8th Street
Morse - basement excavation, setting wall footings. Maintenance Workers Jeff Daly? and Al McHenry work in basement. City parking garage and Fire Station No. 1 in background. Looking North from Morse Lot (Block 10, Lots 15-16) Morse, foundation, footings, basement, Fire Station No. 1, parking garage
Morse - basement excavation. Fever River Archeologist Floyd Mansberger excavates top of the cistern (not visible) while Maintenance workers Al McHenry and Doug Sharp wait and Fever River staffer takes pictures while talking to Historian Tim Townsend and Curator Susan Haake in left background behind tree. Looking South from top of parking garage across Capitol…
Morse - basement excavation. Maintenance Work Leader Vee Pollack in backhoe removes dirt while Maintenance workers Ed Smith, Al McHenry, and Doug Sharp observe. Waste hauler truck waits in alley. Lincoln Woodshed visible in far background right. Looking South from top of parking garage across Capitol Ave. Morse, foundation, excavation, staff, backhoe, parking garage, Capitol…
Morse - restoration, stabilization for winter, including lean-to roof on south room to be rebuilt. Chain link fence surround. City parking garage in background left. Hilton Hotel tower in far background left. Fire Station No. 1 in background right across Capitol Ave. 11 Morse, restoration, stabilization, lean-to, fence, parking garage, Hilton Hotel, Fire Station No.…
Morse - Basement excavation and foundation preparation. Maintenance workers Ed Smith and Al McHenry (on backhoe) begin installing gravel prior to the concrete pour. City parking garage and Capitol Ave traffic in background. Looking Northwest from Morse lot (Block 10, Lots 15-16) Morse, foundation, basement, staff, parking garage, Capitol Ave.
Morse - basement excavation, Floor poured. City parking garage and Fire Station No. 1 in background Looking North from Morse Lot (Block 10, Lots 15-16) Morse, foundation, walls, floor, parking garage, Fire Station No. 1
Morse - basement excavation, Walls poured. Maintenance Work Leader Vee Pollack? checks pipes on floor. Maintenance workers Ed Smith, Sam Blasingame and ? break out forms. City parking garage in background. Looking North from Morse Lot (Block 10, Lots 15-16) Morse, foundation, walls, pipes, parking garage, staff