Work on the south porch, stairs, and fencing on south side of Lincoln Home, during the 1987-88 restoration. Photographer facing north.
Event: Restoration
View of the south facing of the Lincoln Home during the 1987-88 restoration. One ranger on back porch, with two workers painting the fence. Photographer facing north.
View of the south porch exit, steps, and metal handrail prior to the 1987-88 restoration. Photographer facing east.
Work on the south facing, porch, and yard of the Lincoln Home, during the 1987-88 restoration. Photographer facing north west.
Work on the south facing, porch, and yard of the Lincoln Home, during the 1987-88 restoration. Photographer facing west.
A water spigot, probably located on north side of the Lincoln Home foundation.
The Lincoln Home water meter, prior to the 1987-88 restoration.
A component of the Lincoln Home water system, prior to the 1987-88 restoration.
Burying the french drainage system along the south or west face of the Lincoln Home during the 1987-88 restoration. Part of the retaining wall can be seen in the foreground.
The runoff drain and an older brick structure in the Lincoln Home front yard, southwest corner. The items were uncovered during the 1987-88 Lincoln Home restoration. Photographer facing southeast. The north face of the south-facing retaining wall can be seen at the top right of the photo.