Wooden sill beam on the Lincoln Home foundation.
Event: Lincoln Home restoration
Scaffolding, tarps, and bare soil on the west side of the Lincoln Home during the 1987-88 Restoration. Photographer facing North.
Recessed concrete form in place west of the Lincoln Home, ready for pouring. The concrete will form a foundation for the concrete/stone steps leading up to the Lincoln Home, hidden by soil, sand, and the bricks that make up the plaza. The west retaining wall sits behind the form, with an opening for the second…
Utility trench leading up to the north side of the Lincoln Home. The Lincoln Home, retaining wall, and buried plaza can be seen on the right side of the image; the Corneau house (pre-relocation) can be seen to the left. Photographer facing east.
The west face of the Lincoln Home during the 1987-88 Restoration. A recessed concrete form can be seen in place west of the Lincoln Home, ready for pouring. The concrete will form a foundation for the concrete/stone steps leading up to the Lincoln Home, hidden by soil, sand, and the bricks that make up the…
View of entrance into Lincoln Home south west cistern.
View of the Lincoln Home retaining wall, historic gutter drain sleeve, and southwest cistern concrete cap. Photographer facing west.
View of the Lincoln Home historic drain sleeve in southwest yard. Pnotographer facing south east.
Worker removing dirt from Lincoln Home retaining wall, historic gutter drain sleeve, and southwest cistern concrete cap. View from above.
View of Lower entrance section of Lincoln Home southwest corner cistern. Photographer facing northeast.